Ruidong Group Co., Ltd
Home / News

News

News and Events

  • Horizontal concealed Fan Coil Unit in Iraq
    2023-06-05
    Project Name: Iraq Titanic Five -Star Hotel Project Address: Iraqibarda Project Overview: This project is located in Baghdad, the capital of Iraq, with a total construction area of 130036㎡, with a total of 200 standard rooms, restaurants and pools. Selected units: Horizontal concealed Fan Coil Unit, FP068WA and FP102WA, 28 units in total Operation status: It has been operating well since September 2021
  • Air Cooled Screw Chiller and Heat Pump in Qatar
    2023-06-05
    Project Name: Khalifa International Stadium Project address: Qatar Project Overview: Khalifa International Stadium was built in 1976. It is one of the oldest stadiums in Qatar and the home stadium of the Qatar National Team. The stadium has been refurbished, rebuilt and expanded specifically for this World Cup. After the expansion, the number of seats in the stadium increased by 12,000. Khalifa International Stadium adopts a huge curved structure. The most important change after the renovation is the addition of a huge new roof, which is also equipped with an advanced cooling system to provide comfortable conditions for the game. After the World Cup, it will become the Qatar National Stadium. ​Selected unit: air-cooled screw chiller, cooling capacity is 560kw, 800kw and 1000kw, air-cooled scroll chiller is 20kw
  • Mushroom greenhouse project in Seoul, Korea
    2023-06-05
    Project name:Greenhouse Project of Plant Breeding Base in Seoul, South Korea Project address:Seoul, South Korea Project overview:The breeding base shares 20 greenhouses, each with an area of 300-400 square meters, and a total construction area of 10,000 square kilometers. Selected units:Air-cooled breeding air conditioners, 20 units
  • Water Cooled Screw Chiller For Beijing Scientific Research Center
    2023-05-31
    ​Project Name: Ventilation and Air Conditioning Project of Beijing Langtiangang Shunyi Research Center Project Address: Courtyard No. 10, Airport, Shunyi District, Beijing Project overview: This project constructs a scientific research center building with three floors underground and nine floors above ground, with a building height of 45 meters. The total construction area of the project is 44812.3 square meters, of which the above-ground construction area is 26666.6 square meters, and the underground construction area is 18145.7 square meters. This project adopts the fan coil unit plus fresh air system, the air conditioning refrigerant is 7~12°C chilled water, the cold source is provided by the chiller, and the chiller is located on the roof of the building. Contract amount: 46 million yuan Selected units: Water Cooled Screw Chiller and Heat Pump, Cooling tower
  • Air handling units in Xi'an Province, China
    2023-05-31
    Project Name: Xi'an Airport International Convention and Exhibition Center Project address: No. 15 Guangren West Road, Airport New City, Xixian New District, Xianyang City, Shaanxi Province Project overview: The planned land area of the project is about 103,200 square meters, and the total building area is 77,500 square meters, including 56,900 square meters above ground and 20,600 square meters underground. The convention and exhibition center has 3 exhibition halls, 2 log-in halls, a multi-functional hall that can accommodate more than 3,000 people, and multiple conference rooms that can be divided and combined, with a space floor of up to 12 meters. Selected units: Air handling units, 34 units; Heat recovery air handling units, 2 units. ​Operation status: It has been running well since it was opened in November 2021
  • Air Cooled Screw Chiller For Sinopec Shengli Oilfield
    2023-05-31
    Project name: Sinopec Shengli Oilfield, Guangrao County, Gezhuang Town Oilfield Oil Storage Heating Air Conditioning Project Project Address: Daozhuang Town, Guangrao County, Dongying City, Shandong Province Project Overview: This project is the main function of the oilfield oil storage pipeline. Select unit: Air Cooled Screw Chiller, LSGF400ARM four units ​Operation: It has been operating well since November 21st
  • Modular Type Air Cooled Chiller in Luohe City, Henan Province
    2023-05-31
    Project name:Central Air Conditioning System Reconstruction of Qiansheng Department Store, Luohe City, Henan Province Project address:Qiansheng Department Store, Transportation Road and Renmin Road, Yuanhui District, Luohe City, Henan Province Project overview:32,000 square meters of shopping malls Selected units:LSWFM150BR Modular Type Air Cooled Chiller and Heat Pump, 30 units
  • Ventilation and air conditioning in Qingdao, China
    2023-05-31
    Project name:Qingdao New Airport VIP Building Ventilation and Air Conditioning Project address:Qiandiankou Village, Jiaodong Street, Jiaozhou City, Qingdao City, Shandong Province, China Project overview:The VIP building project of Qingdao Jiaodong International Airport is located in the Qingdao New Airport terminal, and a single -column steel concrete frame structure is adopted. The north side of the VIP Tower is adjacent to the B -branch corridor of T1 Terminal, which is divided into three floors above ground, one floor underground, 5.7-13.5 meters above the ground, and a building area of 17315.07 square meters. The VIP ventilation air conditioner of Qingdao Jiaodong International Airport was designed and installed by Ruidong Group Co., Ltd., and the project also won the National High -quality Engineering Award. Contract amount:7.79 million yuan Selected units:Ceiling Air Handling, Fan coil unit, Fire exhaust Fan Operation status:February 2019
  • VRF and Direct Expansion Air Conditioning Unit in Beijing China
    2023-05-31
    Project name:Beijing University of Posts and Telecommunications (Shahe Campus) 1st Phase System Scientific Research Building Project Project address:Changping District, Beijing Project overview:Beijing University of Posts and Telecommunications (Shahe Campus) is a new campus located in the southeast of Shahe Higher Education Park, Changping District, Beijing. The total land area of the first-phase system scientific research building construction project is 572,365.6 square meters, of which the construction area is 397,959.11 square meters. Contract amount: 13 million RMB Selected units: VRF, Direct Expansion Air Conditioning Unit, Fresh air Ventilation Units Operation status:August 2021
  • Congratulations to Ruidong Group for winning the honorary title of "2021-2022 China Installation Engineering Quality Award" (China Installation Star)
    2023-05-31
    Congratulations to Ruidong Group for winning the honorary title of "2021-2022 China Installation Engineering Quality Award" (China Installation Star)On April 26, 2023, the China Installation Association held the seventh director (expanded) meeting and the seventh fourth executive council in Nanjing,
  • Total 6 pages  Go to Page
  • Go

Whatsapp:

+86-13626409993

Email us:

Call us on:

+86-15505345921
Integrating design, production, sales and installation of central air-conditioning products.

Quick Links

Projects

Send Us

Send Us
​Copyright 2023 Ruidong Group Co., Ltd  Sitemap. Support by:Leadong.  鲁ICP备14020406号-32